Map: click to enlarge

Improving Water Quality
  • Bed stabilization using a series of riffles and rock drops
  • Bank stabilization by laying back slopes, toe protection and bioengineering
  • Channel flow redirective measures using rock vanes and rootwads
  • Native grass buffers to filter stormwater runoff
  • Bioretention basins to infiltrate stormwater runoff
Creating a More Natural Stream
  • Stream Alignment Meandering
  • Floodplain Benches
  • Terraces
  • Riffle and Pool Bed Characteristics
  • Native Vegetation

  • Existing creek conditions
  • Bioretention areas
  • Steambank staibilization
  • Native grasses and tree planting buffer

Cole Creek Photo Gallery

Keep tabs on the construction process via our photo gallery.

Tree Mitigation

Click images below to download the corresponding section in PDF format.

  • Click to download this section
  • Click to download this section
  • Click to download this section

for every tree removed, we'll add three more